Showing posts with label cabling. Show all posts
Showing posts with label cabling. Show all posts

Tuesday, 27 November 2007

Firestopping - Easiest just to leave it!

New buildings are designed and built to prevent fires spreading. However, it's not uncommon for cowboy data cablers to neglect firestopping because, once the premises have been handed over to the client, no one inspects the workmanship.

Clients seeking quotations for data cabling must always get the installers guarantee that all firestopping will be reinstated to meet the fire regulations, and ask the installer to indicate the firestopping.

Alan Bullen
Lynx Networks plc

Monday, 5 November 2007

Cabling to last a lifetime

Lifetime Cost Effectiveness
A cabling system represents the element of an voice / data network which has the longest life span and therefore requires to be designed and installed with upwards of 10 years useable life. To ensure consistent performance throughout the life of the system, the following should be considered:
• Warranty and performance guarantees from component manufacturer
• Quality components proven to meet appropriate Standards
• Manufacturers & suppliers support
• The installers have relevant qualifications and training and their installation methods fully comply with BS and EN Standards if the installation is in the UK.

Alan Bullen
Lynx Networks plc
Data Cabling Division

Tuesday, 16 October 2007

TIA-B - The new forum for IT Infrastructure technical issues

Since the closure of the Communications and IT Association (CITA) the data cabling industry has not had a forum for technical issues. However, with the birth of TIA-B, this is changing. Mike Gilmore, Technical Director of the FIA, is the friving force behind TIA-B and is hosting the associated web pages on the FIA website. The ECA are co-hosting TIA-B and another major industry association will soon be annouced as the thrid sponsor. Watch this space.

Alan Bullen
Lynx Networks

Wednesday, 3 October 2007

The Three R's of sustainability

170,000 tonnes of copper was used in 2005 to make telecommunications cable but only 1,000 tonnes of cable was removed and recycled. Clearly this has a significant effect on the environment. However, anyone involved in a cabling project can make a positive impact by considering the three R's of sustainability: Reduce, Reuse and recycle.

Reduce the amount of cable required by not providing more links than is needed, reuse existing links that are perfectly good for the job and recycle any cable that can be removed.

Lynx Networks plc Data Cabling Division

Tuesday, 2 October 2007

Fibre optic Industry Association - Approved Installer Scheme

The Fibre optic Industry Association (FIA) has recently re-launched its approved installer scheme. This has two main purposes: firstly to ensure that customer using an approved installer get a risk-free, high quality installation and secondly, to make it easier for the installer to provide it.

The software supplied to approved installers as part of the scheme ensures that over three hundred potential risks to a project are addressed and alleviated. The FIA now has the task of getting as many installers and integrators as possible join the scheme to give it critical mass, and recognition amongst the users and consultants. The scheme is soundly based on the demands of the BS 6701 and BS EN 50174 Standards.

As believers that standards in IT infrastructure and data cabling need to be maintained, Lynx Networks were the first company to sign up to the scheme.